Verification Checklist

Before Edit

  • Have you confirmed which behavior must be preserved in the spec, acceptance criteria, or task brief?
  • Have you decided whether a failing test should be added or updated first?
  • Have you identified the local verify command and the matching CI job before starting the change?
  • If an evidence bundle is required, can you explain that requirement before editing?
  • If the work mentions a model name, API, SDK, or vendor-specific feature, have you chosen where to record the model/runtime profile and official-doc confirmation date?
  • If issues, PRs, logs, eval cases, traces, or evidence may enter an AI or external service, have you checked classification, redaction, provider terms, and approval requirements?
  • In docs/en/guardrail-coverage-matrix.md, did you assign classification, redaction, permission, approval, storage / retention, and verification to external input, output, tool definition, call, execution, result, resource, trace, session, external-service, and protocol prompt, root, sampling, and elicitation surfaces?
  • Did you record which surfaces the current runtime guardrail covers or does not cover and its confirmation date, then make unknown surfaces return deny or escalate?
  • Are you sure that a referenced trace or old log is not being treated as a substitute for current-run verify?

During Change

  • Have you kept the diff inside the smallest practical work package?
  • Have you updated docs, the brief, and the Progress Note where needed?
  • Have you classified verify failures by failure mode?
  • Have you recorded the verify command and pass / fail result as current-run information?
  • For a long-running task, have you organized the handoff or retry events that should be kept in a trace?
  • If you keep a trace, have you recorded the task / work-package id, run timestamp or run id, owner / handoff, and retry / restart reason?
  • Did you treat tool definitions, tool results, and resources as untrusted input and check provenance and instruction injection before the next call?
  • Did you walk through hostile input, hostile tool output, tainted tool metadata, unsafe side effects, trace leakage, stale or sensitive sessions, and external-provider boundaries using evals/guardrail-surface-cases.json?

Before Review

  • Have you run local verify?
  • Does the verify log preserve the command, timestamp, and pass / fail result?
  • Can the same quality bar be enforced in CI, and can you explain any intentional difference?
  • If the change is UI-facing or otherwise user-visible, have you preserved an evidence bundle?
  • Does the evidence point to the current run?
  • Are Changed Files, Verification, and Remaining Gaps consistent with the current diff?
  • If a trace is cited in review, are the verify reference and evidence linkage explicit?
  • Have you checked whether traces or screenshots need redaction / privacy treatment?
  • If the model/runtime profile changed, did you rerun the eval or smoke check?
  • If AI / external-service submission is involved, did you record the submitted data class, redaction, provider terms, and approval decision under Evidence / Approval?
  • Did python3 scripts/check-guardrail-coverage.py --self-test pass, including negative fixtures that reject a missing required surface, control, or case?
  • If evidence is not required, can you explain why?
  • Have you called out the points that still require human approval?
  • Is there a plan to inspect review bodies, inline comments, suggestions, and confirm zero unresolved review threads?
  • If any check was skipped, is that decision recorded in Remaining Gaps?

Production Gate (When Applicable)

Before Merge / Production-ready Plan

  • Is the target environment and public URL recorded?
  • Is there a location for the post-merge SHA/version and a semantic marker to compare in production?
  • Are the deploy owner, production-confirmation owner, and required approver identified?
  • Are the root smoke, representative routes, and expected HTTP status / content markers defined?
  • Does the metric have a baseline, threshold, window, source, and owner?
  • Are halt conditions, rollback method, restart conditions, and evidence location defined?

After Merge / Production Evidence

  • Do the target SHA/version and deployment/workflow run match?
  • If a successor run cancelled the target run, are successor inclusion, both run URLs, and successor-deployment checks recorded as Superseded evidence?
  • Are deployment approval, deployment success, and production confirmation recorded separately?
  • Were the root and representative-route HTTP status and semantic markers checked?
  • Was the metric checked for the defined window, or recorded as N/A with a reason?
  • Are owner, UTC timestamp, observed values, and evidence URLs recorded in the PR or linked issue?
  • After rollback, were deployment, HTTP, markers, and metrics rechecked for the new main SHA?

Stop Instead Of Merge

  • Does an unrelated verify failure remain unresolved?
  • Is current-run evidence missing even though the change requires it?
  • Do local verify and CI disagree without an explanation?
  • Are there changes that require approval before merge?
  • Do review comments, suggestions, or unresolved threads remain while merge is being attempted?
  • Did the model/runtime profile change without rerunning evals or smoke checks?
  • Is production-affecting work being merged without a completed production-ready plan?
  • Is the work being marked complete while deployment is failed/unknown, SHA or marker mismatches, a representative route fails, or a metric exceeds its threshold?
  • Is deployment success or approval being used as a substitute for production confirmation?
  • Is a cancelled run being treated as Superseded or successful without successor-SHA inclusion and production confirmation?